Skip to main content

Water Service Interruption Advisory


January 25, 2023
Pahibalo sa tanang mga konsumedor sa mga lugar nga apektado sa naka scheduled nga brownout sa Cebeco, nga naglakip sa brgy. Aliwanay,Pondol, Abucayan, Cantibas ug Buanoy. Giawhag kamo sa pagpamundo ug tubig.Daghang salamat.
PAHIBALO!!!!
ADUNAY IPAHIGAYONG SCHEDULED BROWNOUT KARONG ENERO 26 (HUWEBES) SA ATONG BALAMBAN FEEDER 1 LINE SA MGA MUSUNOD NGA LUGAR OG ORAS. KINI ARON PAG-UPGRADE SA MGA OVERHEAD DISTRIBUTION LINES SA ALIWANAY HANGTUD ABUCAYAN, BALAMBAN, CEBU (CAPEX PROJECT). KINI ALANG USAB SA PAGPALAMBO SA KALIDAD SA POWER OG PAGTUBAG SA NAGKATAAS NGA POWER DEMAND. TUNGOD SA SWITCHING SA MGA PRIMARY LINE CONNECTIONS, ADUNAY KASAMTANGANG PAGKAPALONG ANG MASINATI.
ANG CEBECO III LINE PERSONNEL MAGPAHIGAYON SA MGA MUSUNOD NGA KALIHUKAN:
1. FINAL STRINGING OF 336 MCM WIRE
2. POLE DRESSING
3.TYING AND JUMPERING
ORAS OG MGA APEKTADONG LUGAR :
8:00 AM – 5:00 PM (9 HOURS)
STA. CRUZ, ALIWANAY, PONDOL, ABUCAYAN, CANTIBAS, DUANGAN AND BUANOY
GAISANO’S (GRAND MALL, SARI-SARI, TOWN CENTER) AND CEBU ALKEIA DEPT. STORE
8:00 AM – 9:30 AM (1 HOUR AND 30 MINUTES)
4:00 PM – 5:00 PM (1 HOUR)
PARTS OF BUANOY AND ARPILI, BALAMBAN
TOLEDO (TUNGA, LATASAN, MINOLOS, BAIRAN, LUWAS, GUINGKAMOTE)
PART OF CAPTAIN CLAUDIO, TOLEDO (GINAMAGAN, GUINGKAMOTE, LUBO, PANLIWAD-ON, CANSE OG MAYPIS)
TINGUHA SA CEBECO III LINE PERSONNEL OG ENGINEERS NGA MABALIK ANG SERBISYO SA KURYENTE SA GITAKDANG ORAS. GIAWHAG ANG MGA LUMULUPYO SA MGA NAHISGUTANG LUGAR SA PAGBATON SA MAONG PASIDAAN.
DAGHANG SALAMAT SA KANUNAYNG PAGSABOT.